• 1. Automation of Planning and Designing
    With the integrated BIM (building information modeling) system, it is now possible to extract data and automate the planning and designing of construction projects. The Generative Design technology also allows us to review a number of design alternatives of alignment fast and identify the optimal solution. Blast engineering or calculation of compensation money, etc., which took so much time in the past, can now be handled quickly and accurately using the integrated BIM data.
    • Generative Design of Road Alignment
      In consideration of various design conditions, all possible alignment (routes of roads or tracks) are generated by the computer automatically. Using the BIM system, it is now reviewed the actual situations of the site and various limitations in an integrated manner to identify the best alignment quickly. With such an automated process, it is now possible to reduce the design time significantly and find the most efficient alignment at the same time.
      • Reference project: Namhae-Yeosu Undersea Tunnel
      • Intellectual property rights: Patent application 10-2024-0104415
    • Automated designing of blast patterns
      The information on the routes of the construction site and the facilities in need of protection (security properties) is managed in an integrated manner using the BIM system. With such integrated information, it is now possible to design a blast pattern so that all facilities around the blast zone are within the allowable vibration limits. Since it is possible to conduct a review promptly using the BIM, the time taken in the process can be reduced while safety is even further enhanced.
      • Intellectual property right: Registered patent 10-2609923
    • Automation of the calculation of the compensation money due to the development of roads/railways
      The land, building, topology, and alignment information can be managed in a single BIM system to calculate the compensation money for the routes of roads and railways automatically. With this, it is now possible to estimate the compensation money to be paid from the planning phase of the initial alignment and select the alignment in an even more efficient manner.
      • Reference project: GTX-A
      • Intellectual property right: Patent Application 10-2024-0109202
  • 2. BIM Platform
    A solution to review the objects, volumes, and processes during the designing and construction phases in a single integrated platform. The construction plan’s credibility is secured through the process plan reviews based on the BIM.
    • BIM-based construction management system
      With a web-based BIM platform, 4D pre-construction is performed to analyze the feasibility of the process. It is also possible to manage quality and safety by connecting to the in-house data system.
      • Intellectual property right: Program S-2010-002952   Registered patent 10-263655
    • BIM-based quantity calculation system
      By codifying the data extracted from the BIM object and connecting with pre-defined functions and manifests automatically, the necessary quantities can be calculated accurately (number, length, area, volume, etc.) With this, you can now establish a bill of quantities for the structures in various construction projects such as harbors, railways, and roads while managing your project more efficiently and accurately.
      • Reference projects: Gangreung-Jejin Railway Project, Pyeongtaek-Osong Railway Project, No. 2 Gyeongchoon Regional Highway