“Prevent inter-floor noise with alert.” DL E&C begins to expand the full-scale service of ‘D-Silence’. 2025.07.09 DL E&C installed large modules for Shaheen Project. 2025.07.07 DL E&C earned ‘top rating’ in mutual cooperation evaluated by MoLIT, leading shared growth with partners. 2025.07.04 DL E&C conducted on-site inspections and launched campaign in response to severe hot weather. 2025.06.10 DL E&C and Daelim Cultural Foundation conduct creative arts education for elementary students. 2025.06.04 DL E&C Completes Installation of Final Caisson for Ulleung Airport 2025.05.08